Collectively, The Hershey Company and The Korte Company have worked on a number of projects, including the 1.1 million square foot Hershey Midwest Distribution Center in Illinois as well as its subsequent 300,000 square foot addition a few years later.

The newest food grade facility resides on a 213-acre site just outside of Hershey, Pennsylvania and measures 819,200 square feet. The bulk of the Design-Build Agile Fulfillment Center’s square footage (783,200 square feet) is dedicated to process and storage operations. The two-story office space areas comprises the remaining 36,000 square feet.

Because of the ambient sensitivity of chocolate, process and storage areas are designed to maintain a constant temperature of 60 degrees and a maximum relative humidity of 50%. Additionally, the facility is protected with an emergency backup generator designed for 36 hours of facility operation.

The process and storage area also features a clear height of 39 feet and includes several mezzanines for parts storage, electrical substations and equipment processes. Type K shrinkage compensating concrete was used for the floor slab to maximize the quality and lifespan of the floor without the need for control joints.

The facility is Energy Star Certified and includes a lithium-ion forklift charging station, 200,000 gallon fire water tank and pump house building, ESFR (Early Suppression Fast Response) fire sprinkler system with In-Rack sprinklers in the process and storage areas.

A welcome center with a large canopy covering two inbound and outbound lanes of truck traffic as well as a free-standing guard house with turnstile gates for employee and visitor access were also included in the scope of work.

Project details

Let's talk

Get build-smart guidance from our experienced Design-Build team.

Get started
Project Details
Markets
  • Consumer Goods
  • Distribution & Processing
Clients
  • Hershey Foods Corporation
Architects
  • Korte Design, Inc.
Services
  • Design-Build
  • Design Services
Size
  • 819,200 square feet
Location
  • Annville, PA
>

Offices

St. Louis
5700 Oakland Avenue
Suite 275
St. Louis, MO 63110
Phone: 314-231-3700
Fax: 314-231-4682
Highland
12441 US Highway 40
PO Box 146
Highland, IL 62249
Phone: 618-654-8611
Fax: 618-654-4999
Las Vegas
9225 W. Flamingo Road
Suite 100
Las Vegas, NV 89147
Phone: 702-228-9551
Fax: 702-228-5852
Oklahoma City
PO Box 46038
Oklahoma City, OK 73145
Phone: 405-900-6239
Houston
4151 Southwest Freeway
Suite 230
Houston, TX 77027
Phone: 346-272-0006
BUILDING EMERGENCY? CALL US 24/7 AT 618-654-8611
"I'D RATHER DRIVE NAILS THAN EAT." -RALPH KORTE