The Korte Company provided Design-Build services for a new, three-story shipyard shop building. The Waterfront Support Building contains an open, first-floor work area for shipyard maintenance operations, a mezzanine level supporting locker space and decontamination showers, and second and third floors devoted to fleet and shipyard office space. The shop area includes jib cranes, a welding area and a compressed air distribution system.
This complex project required that we use staged demolition, relocate a two-story historic building and work within a limited footprint adjacent to an operational dry dock. For this project, we constructed in conjunction with the high security Controlled Industrial Area at Bremerton Naval Shipyard.
Learn more about Department of Defense construction by The Korte Company.