This project consists of the construction of a 15,000 SF addition and a 31,000 SF remodel and renovation of the existing lodging facility at Camp Pendleton, California. Completed in two phases, the Phase I addition of 24 units incorporated a split-level floor design to complement the existing elevations and alleviate additional costs.
This addition included enhanced guest amenities, including a covered bridge to the original structure, a new two story elevator and courtyard with fountain. A parking lot, playground and landscaping were also added. The design and construction plan incorporated efforts to minimize disruption to the existing facility throughout construction.