Cerro Flow Products, a manufacturer of world-class grade copper tube for the plumbing, HVAC, refrigeration, and industrial markets, selected The Korte Company to design and construct an expansion to their Sauget warehouse as well as other improvements to their existing facility.
The expansion and improvement project included an extensive renovation including both demolition and the design and construction of a 76,000 square foot warehouse addition. The metal building warehouse expansion incorporated the replacement of existing floor slabs as well as the addition of new footings and interior floor slabs.
Improvements to the docking areas included new loading bay areas and insulated dock doors, dock levelers, vehicle restraints, utility posts and trailer cooling fans. The scope of work also included the design and installation of a complete heating and ventilation system throughout the entire warehouse.
Additionally, a new electric system as well as new lighting and switches was installed throughout. A dry sprinkler system including all piping, electric alarms, controls, sprinkler heads and back flow devices was also included.
Office areas were constructed, which included new flooring, HVAC, electrical, phone and sprinkler systems.