The Korte Company was awarded the 74,500-square-foot construction and modernization project at the Naval Air Base in Whidbey Island, Washington. The existing, 43,700-square-foot hangar modernization project included upgrades to building codes and standards. The facility will accommodates six EA-18G aircraft and three EA-18G aircraft squadrons.

A 30,000-square-foot, two-story addition adjoins the existing hangar. Together, the modernization and addition includes the installation of new maintenance shop spaces, maintenance and building support spaces as well as squadron tactics and administration uses on the second floor.

The facility is expected to achieve LEED Silver Certification per US Green Building Council (USGBC) requirements.

Learn more about military construction at The Korte Company.

Project details

Let's talk

Get build-smart guidance from our experienced Design-Build team.

Get started
Project Details
USGBC Certification
  • LEED Certified Silver
Markets
  • Department of Defense
  • Hangar
Services
  • Design-Build
Clients
  • U.S. Navy - Naval Facilities Engineering Command
Architects
  • Belay Architecture
Size
  • 74,500 square feet
Year
  • 2016
Location
  • Whidbey Island, WA
Print version

Offices

St. Louis
5700 Oakland Avenue
Suite 275
St. Louis, MO 63110
Phone: 314-231-3700
Fax: 314-231-4682
Highland
12441 US Highway 40
PO Box 146
Highland, IL 62249
Phone: 618-654-8611
Fax: 618-654-4999
Las Vegas
9225 W. Flamingo Road
Suite 100
Las Vegas, NV 89147
Phone: 702-228-9551
Fax: 702-228-5852
Norman
128 E. Main Street
Suite 101
Norman, OK 73069
Phone: 405-470-4959
Fax: 405-701-5979
BUILDING EMERGENCY? CALL US 24/7 AT 618-654-8611
"I'D RATHER DRIVE NAILS THAN EAT." -RALPH KORTE